Skip to content
ADA and Sidewalk Master Plan

Arlington ADA Transition Plan and Sidewalk Master Plan – Public Access Survey

This survey is designed to help the City of Arlington identify the areas of most significant public concern and to help us provide better access and improve the sidewalk network throughout our community. As you answer these questions, please consider only City-owned, public properties, programs, services, activities, and other public amenities owned or operated by the City.

Please answer the following questions from an Americans with Disabilities Act (ADA) perspective.

0% answered

Public Rights of Way

1.  

Thinking only about City-owned, public rights-of-way in the City of Arlington, have you experienced any physical barriers, inaccessible sections, or poor conditions along a pedestrian path (e.g., sidewalks, pedestrian street crossings, pedestrian driveway crossings, curb ramps, etc.) you currently use or would like to use?

Maximum 20,000 characters

0/20,000

3.  

When using sidewalks along the public rights-of-way within the City of Arlington, have you encountered locations where you had trouble crossing a street or driveway?

Maximum 20,000 characters

0/20,000

5.  

Have you encountered difficulties using a pedestrian crossing due to a lack of pedestrian push buttons or pedestrian signals?


Maximum 20,000 characters

0/20,000

7.  

Have you encountered any other accessibility challenges/concerns related to the public rights-of-way within the City of Arlington not covered by the questions above?

Maximum 20,000 characters

0/20,000

Maximum 20,000 characters

0/20,000